4 Greenland Resources

/

Click to zoom.

Project Details:

Client:
Location: Greenland
Resource: Molybdenum
Services: Mine Engineering, 2006 PFS, 2008 Feasibility Study, Engineering Studies
Year: 2006-2020

Project Scope:

  • 2006 Pre-Feasibility Study
  • 2008 Feasibility Study
  • 2008-2020 Internal Engineering Studies
  • 2022 Feasibility Study (in progress)
  • https://greenlandresources.ca/

Description:

Moose Mountain Technical Services (MMTS) is an ongoing partner with Greenland Resources Inc (GRI), working together on the development of the Malmbjerg Molybdenum Project in eastern Greenland.

MMTS has been involved with the Malmbjerg project for nearly 15 years. Our expertise in innovative mine operation planning in remote mountaintop environments and extreme winter operating conditions has kept us engaged with various ownership groups over the years. We were responsible for the Mine Engineering in the 2008 Feasibility study that led to an exploitation license. The project never advanced with the downturn in Molybenum prices. The project has since changed hands and MMTS has been engaged by GRI to update the Feasibility Study and assist with logistics and strategic production scheduling for an optimal cash flow.


Other Projects:

6 North Coal -Michel Creek
Coal — MMTS was retained in 2012 by CanAus Coal Ltd. now North Coal today. Early studies included resource estimates developed from historical drilling programs, conceptual mining studies, and early economic models.…
2 St Barbara - Atlantic Gold
Gold — Moose Mountain Technical Services (MMTS) is an ongoing partner with Atlantic Gold Corporation (AGC), working together on the development of the Moose River Consolidated Project (MRC). Through the years, MMTS…
7 Panoro - Cotabambas & Antilla
Copper, Gold, Silver, Molybdenum — MMTS was retained in late 2015 by Panoro Minerals Ltd. to review their Cotabambas and Antilla copper projects in Peru. Current PEA mine plans were facing capital hurdles and challenges…
1 Seabridge - KSM
Gold, Copper — MMTS began work on KSM with Seabridge in 2008 with the open pit mine engineering for the initial PEA. Since then, the project has continued to grow as more and…

Designed by Gratisites Inc.: Calgary web design