Northcliffe – Sisson

/

Click to zoom.

Project Details:

Client:
Location: New Brunswick, Canada
Resource: Tungsten, Molybdenum
Services: Feasibility Study
Year: 2011-2012

Project Scope:

  • Scoping Study
  • Feasibility Study mine planning

Description:

In 2011, MMTS began work on the Sisson Tungsten‐Moly project in central New Brunswick, Canada. After positive results from the scoping study, MMTS was retained again in 2012 to continue the mine planning for a Feasibility level study. This was a fast‐tracked study; moving quickly from a scoping study to Feasibility year over year. MMTS worked closely with Northcliff (a subsidiary of HDI Mining) and Samuel Engineering to address the unique challenges of accelerated scheduling. Northcliff successfully submitted the Feasibility study to the EA process in 2013. In 2014, MMTS began additional optimizations at the request of the client.


Other Projects:

3 Almaden - Ixtaca
Gold — Ixtaca is a project in Eastern Mexico in the Tuligtic Claim in the Puebla State adjacent to Mexico City. In 2001 the geological team discovered indications of gold and in…
1 Seabridge - KSM
Gold, Copper — MMTS began work on KSM with Seabridge in 2008 with the open pit mine engineering for the initial PEA. Since then, the project has continued to grow as more and…
5 Copper Fox Metals - Van Dyke
Copper — Copper Fox is a proposed copper mine using In Situ Copper recovery to extract the copper from the ground, while keeping rock in the ground.  Bedrock will remain in place…
8 Coeur - Rochester
Silver, Gold — MMTS was contacted by Coeur Rochester in 2013. An evaluation of the operation was conducted and a thorough review of the existing mine plan, schedule and equipment fleet was performed.…

Designed by Gratisites Inc.: Calgary web design