Sisson

/

Click to zoom.

Project Details:

Client:
Location: New Brunswick, Canada
Resource: Tungsten, Molybdenum
Services: Feasibility Study
Year: 2011-2012

Project Scope:

  • Scoping Study
  • Feasibility Study mine planning

Description:

In 2011, MMTS began work on the Sisson Tungsten‐Moly project in central New Brunswick, Canada. After positive results from the scoping study, MMTS was retained again in 2012 to continue the mine planning for a Feasibility level study. This was a fast‐tracked study; moving quickly from a scoping study to Feasibility year over year. MMTS worked closely with Northcliff (a subsidiary of HDI Mining) and Samuel Engineering to address the unique challenges of accelerated scheduling. Northcliff successfully submitted the Feasibility study to the EA process in 2013. In 2014, MMTS began additional optimizations at the request of the client.


Other Projects:

Complex Coal Geology
Complex Coal — MMTS members have extensive experience in many complex coal projects around the world; particularly in British Columbia. We are recognized as experts in this field. MMTS supports world-class producing mines…
KSM
Gold, Copper — MMTS began work on KSM with Seabridge in 2008. Since then, the project has continued to grow as more and more mineable resources have been discovered. KSM is ranked as…
Michel Creek
Coal — MMTS was retained in 2012 by CanAus Coal Ltd. now North Coal today. Early studies included resource estimates developed from historical drilling programs, conceptual mining studies, and early economic models. The studies…
Cotabambas & Antilla
Copper, Gold, Silver, Molybdenum — MMTS was retained in late 2015 by Panoro Minerals Ltd. to review their Cotabambas and Antilla copper projects in Peru. Current PEA mine plans were facing capital hurdles and challenges…

Designed by Gratisites Inc.: Calgary web design